ri-tools.fr

Commercial property insurer: quota share then excess of loss

Open the calculator

The fictitious case and its key figures

The undertaking

A commercial property insurer: fire, water damage, machinery breakdown, weather events on business premises. Its claims range from a small water damage settled within a year to a large factory fire followed for several years; two storms, in 2020 and 2024, hit many insured sites.

It has built a programme of three treaties. A quota share first cedes 25% of each claim. On what it keeps, a per risk excess of loss takes the part above 400,000 euros, up to 1,600,000 euros. What remains, added up by event, finally goes into a per event excess of loss: 3,000,000 euros in excess of 1,200,000 euros.

Commercial property insurer, ten accident years from 2017 to 2026: twelve claims a year, including a few large fires, and two storms (2020, 2024). Quota share 25%, then per risk excess of loss 1,600,000 in excess of 400,000, then per event excess of loss 3,000,000 in excess of 1,200,000.

    Key figures at the closing date 31 December 2026, in EUR:

    gross ultimate position used (projected triangle)44 879 342
    ceded ultimate position used (projected triangle)29 237 859
    net ultimate position used (projected triangle)15 520 456
    undiscounted gross claims reserve: ultimate minus paid5 714 027
    undiscounted ceded claims reserve: ultimate minus paid3 572 411
    undiscounted net claims reserve: ultimate minus paid2 020 590

    Calculations available for this case

    Calculate the triangles and reserves of a quota share then excess of loss programmeCalculate the reinstatement premiums of an excess of loss

    What the fictitious case shows

    The order of the treaties changes what each one sees. The quota share reduces each claim by a quarter before the per risk excess of loss: a 1,000,000 euro fire is only seen by the layer for 750,000 euros, and cedes only 350,000 euros to it. The per event excess of loss only sees the retention after the first two treaties.

    The total ceded triangle is the sum of the three treaty triangles, cell by cell; each treaty has its triangle in the list, which shows the share of each one in the insurer's protection, year by year. The reinstatements of both excess of loss treaties are paid pro rata of the year remaining at the date of loss: the February 2020 storm costs 257,000 euros of reinstatement premium, the late October 2024 one only 60,000; 0.84 million euros in total at ultimate, added to the net cost.

    How to read the result

    The total ceded reserve adds up three kinds of cession: a stable proportional share, which follows the gross, and two non-proportional shares, sparse and late. Recent years cede mostly through the quota share: their large claims are not known yet, or not yet above the retention.

    The net, projected on its own triangle, is what the insurer keeps after the whole programme. Each triangle is projected with its own Chain Ladder: gross, ceded and net only add up approximately, and the gap is reported among the alerts.

    How the result of this example is built

    The formula graph with the amounts of the example: on the left the result, on the right what it reads. The first levels are shown here; the calculator unfolds everything, down to the data entered.

    Undiscounted ceded claims reserve: ultimate minus paid of the example Commercial property insurer: quota share then excess of loss: formula graph with the amountsceded reserveundiscounted ceded claims reserve:ultimate minus paid3 572 411 EURceded ultimate by accidentyearceded ultimate position used(projected triangle), by accidentyear29 237 859 EURultimate ceded incurred byaccident yearultimate position of the cededincurred, by accident year29 237 859 EURincurred cededtriangle of incurred ceded, alltreaties+ 3 components in the calculatorfactor to ultimate cededincurredfactor to ultimate of the cell,ceded incurred+ 11 components in the calculatoryearaccident year of the cell, as akeyaccident yearaccident year of the cell+ 2 components in the calculatorceded paid by accident yearceded cumulative paid at theclosing date, by accident year25 665 448 EURlatest ceded paid by accidentyearceded paid on the latest diagonal,by accident year25 665 448 EURpaid cededtriangle of paid ceded, alltreaties+ 3 components in the calculatoryearaccident year of the cell, as akeydetailed above
    • ceded reserve undiscounted ceded claims reserve: ultimate minus paid : 3 572 411 EUR — ceded reserve = sum(ceded reserve by accident year)
      • ceded ultimate by accident year ceded ultimate position used (projected triangle), by accident year : 29 237 859 EUR — ceded ultimate by accident year = if(Q06 = "payes" ; ultimate ceded paid by accident year ; ultimate ceded incurred by accident year)
        • ultimate ceded incurred by accident year ultimate position of the ceded incurred, by accident year : 29 237 859 EUR — ultimate ceded incurred by accident year = group_on(incurred ceded ⊗ diagonal ⊗ factor to ultimate ceded incurred ; year ; "annee_surv")
          • incurred ceded triangle of incurred ceded, all treaties
          • factor to ultimate ceded incurred factor to ultimate of the cell, ceded incurred
          • year accident year of the cell, as a key — year = joined(accident year)
            • accident year accident year of the cell
      • ceded paid by accident year ceded cumulative paid at the closing date, by accident year : 25 665 448 EUR — ceded paid by accident year = latest ceded paid by accident year
        • latest ceded paid by accident year ceded paid on the latest diagonal, by accident year : 25 665 448 EUR — latest ceded paid by accident year = group_on(paid ceded ⊗ diagonal ; year ; "annee_surv")
          • paid ceded triangle of paid ceded, all treaties
          • year accident year of the cell, as a key (detailed above)

    Explore the whole graph of this example

    Glossary terms it illustrates

    Frequently asked questions

    In which order do the treaties apply?

    The quota share first, on each claim; then the per risk excess of loss, on the retained part of each claim; then the per event excess of loss, on the aggregate by event of what remains.

    Why does the per risk excess of loss cede less than expected?

    Because it sees the claims after the quota share: a claim must exceed 400,000 euros after the 25% cession, about 533,000 euros gross, to reach the layer.

    Can the share of each treaty be seen?

    Yes: the triangle of each treaty is in the list of triangles and in the exported workbook, with the total ceded and the net.

    All fictitious cases